Correct jaw change

The detailed technical diagram provides detailed explanations. Individual product features can be found in the technical data, drawings, etc.

814651 ROTA-S plus 500-162 C8-VP2

Content available soon
When the base jaw is fully inserted into the guideway, the slide positions the base jaw serration for the wedge bar. The base jaw holds the locking slide in the release position. The chuck can now be actuated.
1
Push button
2
Slide
3
Traverse slide
4
Locking slide
5
Base Jaw